Suited to situations where fittings are against an internal or external blockwork wall or where there is insufficient void depth to conceal fittings. Box duct units are available in varying depth and width dimensions to suit the project. Supplied as either a Pre-Plumbed unit complete with sanitaryware and brassware ready for final connection, or as an un-plumbed assembled panel unit, the HealthCare CPS Box Duct System offers efficient use of space, accelerated installation times and reduced site waste and packaging.
To complete your project Inscape can also provide:
- Complete range of WC Cubicles, Washroom Ducts and Vanity Units
- Lockers and Bench Seating also available
- Full On-Site installation service
- Off-Site Modular Manufacturing
- Pre-plumbed and loose sanitaryware
- On-site first fix plumbing (pipework, floats and final connections)
- Stainless Steel Washroom Accessories (soap dispensers, paper towel holders, etc)
- Whiterock Hygienic Wall cladding (other brands available if required)
- Fitted Furniture & Equipment (cabinets, worktops, tray units, etc)
- CAD drawings provided as standard
- 3D visualisations available to support your project
Tameside General Hospital
Practical and Patient Centred
Combining quality and durability to provide washroom environments for new a hospital development in Greater Manchester.
Working closely with client, Consort Healthcare, Inscape has created washroom facilities for a new unit at Tameside General Hospital, designed to meet the demands of daily use by many people. The £72million development comprises two new surgical wards, an integrated childrens ward, three day-care centres, three inpatient centres and a new mental health unit for the elderly.
Efficiency and economy
With modern high footfall hospital environments providing some of the biggest challenges to washroom installation specialists, in terms of the need for speed of construction and durability of product, it was clear a specialist solution was required. Inscape’s Healthcare CPS modular system was selected thanks to various factors including its suitability for areas with heavy traffic and the fact that the units could be manufactured, assembled, pre-plumbed and tested in the factory, requiring only final connections to be made on site at Tameside General.